Sliding-window comparison
Stage 1 simulation interval: 250 m tree step ÷ 1.2 m/s ground-speed limit = 208.333… s (≈ 3 min 28 s) per decision. Up to 120 decisions = 25,000 s (6 h 56 min 40 s); acquisition can end earlier. Stage 2 uses 30 s per cycle.
Loading…
Sliding window
Selected deployment
| Environment | Robots | Window | Tracking | Contact | Effort | Shifts |
|---|
Validation pending: tracking finished, but earlier paths and readings need rechecking against their historical windows. These runs are excluded from the completion rate.
Sliding-window results
| Environment | Robots | Saved | Validated 24 h completion | Validation pending | Acquisition failed |
|---|
Completion rates use evaluated missions, including acquisition failures. Pending runs, validation-pending runs and technical interruptions are excluded.
Protocol and earlier pilot
Both variants use the same frozen deployments, seeds and planning budgets. Stage 1 uses a fixed window; each mission continues from its own handoff. The sliding variant enables window movement only during Stage 2. Tracking is requested for 24 hours at 30 seconds per decision. The two maps use the same scale. Native salinity and wet masks are independent of the controller's filled readings.
Contact is the fraction of robot-time with native-supported salinity within 0.12 PSU of the target. Effort is mean squared water-relative speed normalized by the squared speed limit. Validation-pending scores are provisional. No frames or final scores are inferred for pending or interrupted runs.